área:
Asia
Tipo de habitación
Casa modular
Campo:
Educación y Comercio
área:
1000-4000㎡
escenas:
Oficina
situación:
2025year
Características del proyecto:
1. Project Total Duration Requirement: The entire construction and completion inspection must be finished from August 1 to August 31, before teachers and students enter the campus, ensuring the normal teaching operations of the school.
2. Material Quality: All building materials must provide certificates of compliance, manufacturer's qualifications, and test reports; interior and exterior decorative materials must meet national environmental protection standards.
3. Air Quality Testing: Strictly adhere to the air quality testing standards for teaching spaces to ensure the health of teachers and students. Additionally, lightning protection testing has been conducted and all requirements have been satisfied.
Volver a la lista
Escanear el código QR a seguir